Summary

In Guelph you apply for a building permit online through the Guelph Permit and Application System (GPAS), where you also pay fees and book inspections. Review takes about 10 business days once fees are paid. Residential fees follow the Building By-law, with a $160 minimum for low-rise homes ($165 from January 1, 2027).

Last verified

Administered by the City of Guelph's Building Services (Permit Services and Inspection Services). Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


Before you apply

What projects need a building permit in Guelph?

The City lists, among others: a new house; decks, porches and balconies; additions; pools and hot tubs; sheds, gazebos and detached garages; roof structures, underpinning, exterior stairs and replacing siding; interior renovations such as kitchens, bathrooms, finished basements, moving walls, new or larger windows and doors; an additional dwelling unit; a chimney or woodstove; changing a building's use; new or moved plumbing fixtures; septic and site-servicing work; and major ductwork or a new heating system.

If you are not sure, ask Permit Services at permits@guelph.ca or 519-837-5615 extension 4255. Building Services does not issue electrical permits; electrical work goes to the Electrical Safety Authority.

Source: City of Guelph, Residential Building Permits and Inspections

Who is responsible for getting the permit?

The homeowner. The City says it is the homeowner's responsibility to get a permit before any work starts, even when a contractor offers to handle it. If work was done without a permit, the current owner must still obtain one, and starting construction without a permit is illegal and a provincial offence.

Source: City of Guelph, Residential Building Permits and Inspections

Do I need a designer to draw my plans?

The City recommends a qualified designer, and some elements must be designed by an architect or professional engineer. A homeowner may draw their own plans with CAD software or graph paper, as long as they are drawn to a recognized scale (such as 1/4 inch to 1 foot), dimensioned to the outside of exterior walls, and come with a survey or site plan showing the lot and all buildings.

A survey or site plan may not be needed for some permits, such as finishing a basement.

Source: City of Guelph, Residential Building Permits and Inspections


Applying and review

How long does a building permit take?

About 10 business days for a residential application, counted from when the permit fees are paid. Applications are reviewed in the order received, and you are told if deficiencies are found. Some properties also need sign-off from Engineering Services, Heritage Guelph, the Ministry of Transportation or the Grand River Conservation Authority before the permit is issued.

Source: City of Guelph, Residential Building Permits and Inspections


Fees and refunds

How much is a residential building permit in Guelph?

Fees are set in Schedule A of the Building By-law. A new low-rise home is $1.97 per square foot (from July 1, 2026), and flat fees apply to items like decks, sheds, pools and hot tubs. Fees rise again on January 1, 2027. The fee covers plan review and the required inspections and is not subject to HST. The minimum for any low-rise residential permit is $160 ($165 from January 1, 2027).

Selected residential building permit fees

Selected residential building permit fees
PermitFrom July 1, 2026From January 1, 2027
New low-rise house or townhouse$1.97 per sq ft$2.03 per sq ft
Garage or carport (per bay), shed, deck, porch, exterior stairs$160$165
Hot tub$160$165
Swimming pool$320$330
Finishing a basement, renovating finished space$0.59 per sq ft$0.61 per sq ft
Accessory apartment or lodging house$0.59 per sq ft, $480 minimum$0.61 per sq ft, $495 minimum
Fireplace or woodstove (each)$160$165
Plumbing (per fixture)$30$30
HVAC (residential, per suite)$160$165

Minimum permit fee for low-rise residential work: $160, then $165 from January 1, 2027.

Table source: City of Guelph, Building By-law (2015)-19985, Schedule A: Building Permit fees

Source: City of Guelph, Residential Building Permits and Inspections: Frequently Asked Questions

What happens if I start work without a permit?

Construction without a permit is illegal and subject to legal action under the Building Code Act. If an order has been issued, the Building By-law adds an administration fee of 50% of the required permit fee, up to $5,000, payable before the permit is issued and on top of any other penalty. Occupying a building without a required occupancy permit carries a separate $640 fee.

Source: City of Guelph, Building By-law (2015)-19985, Schedule A: Building Permit fees

Can I get a refund if I cancel my permit?

On written request, the Chief Building Official decides the refund: 80% if only administrative work was done, 70% after zoning review, 50% after plans examination, and 35% if the permit was issued but no inspections were done, less 5% for each field inspection after issue. No refund under $50 is paid, and none after two years from application (unissued) or one year from issue.

Source: City of Guelph, Building By-law (2015)-19985, Schedule A: Building Permit fees


Inspections

How do I book a building inspection?

Through GPAS, with 48 hours' notice. The mandatory inspections are listed on your permit, and they do not happen automatically: it is the homeowner's job to schedule them when the work is ready. Skipped inspections can mean opening up finished work so it can be inspected. For help, contact Inspection Services at inspections@guelph.ca or 519-837-5614.

Call Ontario One Call before you dig to have underground utilities located.

Source: City of Guelph, Residential Building Permits and Inspections

Will a permit raise my property taxes?

It can. Improvements such as a deck, an addition, a finished basement or a pool may change the assessed value of your property, which is set by the Municipal Property Assessment Corporation (1-866-296-6722), not by the building permit.

Source: City of Guelph, Residential Building Permits and Inspections

Sources

Every factual claim above traces to one of these documents.

  1. City of Guelph

    Residential Building Permits and Inspections

    Retrieved November 27, 2026

  2. City of Guelph

    Building Permits and Inspections

    Retrieved November 27, 2026